Hotline+86 400-008-5786WhatsAppTelegramEmail

Made to measure · Plaster · Alabaster · Travertine

Every light is drawn
to your project.

Nothing on this site is stock. Size, drop, head count, material, finish, voltage and dimming are set per order — cast-plaster ceiling and wall pieces as well as alabaster and travertine pendants. Send a drawing, a size or a photo; an engineer answers with feasibility, a dimensioned drawing and the lead time.

674
models, all made to order
1
pc minimum order
2
working days to a drawing
20–35
days production
Alabaster ring pendant in a hotel lobby

Made to measure

Six things that change on every order

Start a custom piece →

The photos show one configuration of each model, not the only one we build. Everything below can be re-drawn against your project.

Size and drop

Ø60 mm to Ø1800 mm on round pieces; rectangular plaster trims from 80 × 80 mm. Drop height is set to your ceiling.

Head count

1 to 25 lights on one frame. Spacing, arms and mullions are re-drawn so the piece fits the room.

Material

Cast plaster, alabaster, travertine, marble or stone composite — the material of each model is stated on its page.

Finish

Polished brass, antique bronze, black titanium or nickel — or plaster left matt and paintable, filled flush into the board.

Light source and control

E14, E27, G9, GU10 or LED module; TRIAC or DALI dimming; CE, UL or ETL on the same body.

Minimum and lead time

MOQ from 1 pc on most models. 20–35 days production, counted from the day you sign the drawing.

Custom

Start a custom piece →

Send a sketch or a reference image. We reply with feasibility, a drawing and the lead time.

Send request →

Process

From sketch to crate, four steps

  1. 01

    Send the specification

    Size, head count, material, finish, voltage and destination. A sketch, a photo or a model number is enough to start.

  2. 02

    Drawing in 2 working days

    We answer with feasibility, a dimensioned drawing and the lead time — or tell you what has to change if the form cannot be built as asked.

  3. 03

    You sign off

    Drawing, finish and quantity confirmed in writing. Nothing is cast before that.

  4. 04

    Production, 20–35 days

    Cast, finished, tested and packed to the approved drawing. IES, CAD and Revit files are issued with the order.

Four series

Start from the project type

View all →

Popular models

Start with these

Material and construction

What to check when the piece arrives.

Resources →